..
Suche
Hinweise zum Einsatz der Google Suche
Personensuchezur unisono Personensuche
Veranstaltungssuchezur unisono Veranstaltungssuche
Katalog plus

Establishment of a database for pile test loads and development of a concept for the systematic evaluation and presentation of test load results

 

Operating Time: 
01.05.2022 - 30.04.2023
Sponsor: 
F & E Vorhaben, Otto Quast Bauunternehmen GmbH & Co. KG und JACBO Pfahlgründungen GmbH
Responsible:
Johannes Kuhlmann, M.Sc.

 

Brief description:

In this project, a database with results of dynamic and static pile load tests for different pile types and different boundary conditions for load and soil will be built up for the standardized evaluation of the pile load tests based on internal archived project documents. For this purpose, the provided pile load tests results will be analyzed and made usable for further use. This will provide the basis for further analysis of the load-bearing behavior of different pile systems with a view to possible optimization.

 

 
 
Suche
Hinweise zum Einsatz der Google Suche